NAVFAC Mid-Atlantic, Site 6A Fenceline GWETS, NWIRP Calverton, NY KGS constructed the GWETS and building using in-house construction management, S&H, engineering, and QC staff. KGS managed construction of the 25’ x 35’ x 14’ GWETS building and installation of the GWETS components including extraction well pumps, air stripper skid including blower and transfer pumps, chemical feed pump, and corresponding Facility Control Continue Reading
Groundwater Extraction, Treatment and Discharge System (GWETS) Installation
