Category Archives: Construction

Groundwater Extraction, Treatment and Discharge System (GWETS) Installation

NAVFAC Mid-Atlantic, Site 6A Fenceline GWETS, NWIRP Calverton, NY KGS constructed the GWETS and building using in-house construction management, S&H, engineering, and QC staff.  KGS managed construction of the 25’ x 35’ x 14’ GWETS building and installation of the GWETS components including extraction well pumps, air stripper skid including blower and transfer pumps, chemical feed pump, and corresponding Facility Control Continue Reading

Read more

Install New Running Track with Fitness Stations

[span5]Field Area at Fort Hunter-Liggett, California Contract amount: $943,997.03 Provide all labor, materials, equipment, supplies, and consultant services as required for the construction of a Running Track and Fitness Stations with options for a French Drain and Track Lighting. [/span5][span2] CLIENT US U.S. Army Corps of Engineers, Louisville Romano Mazzoli Federal Building 600 Dr. Martin Luther King,…
Read more

Install New Track Turf, Power Service and Field Lighting

[span5]Field Area at Fort Hunter-Liggett, California Contract amount: $941,060.25 Provide all labor, materials, equipment, supplies, and consultant services as required for the installation of New Running Track, Artificial Turf, Power Service Extension and Field Lighting. [/span5][span2] CLIENT US U.S. Army Corps of Engineers, Louisville Romano Mazzoli Federal Building 600 Dr. Martin Luther King, Jr. Place…
Read more

Emergency Boiler Replacement at the 375th Medical Group Building 1530

[span5]Scott AFB Clinic, Scott AFB, Illinois Contract amount: $2,873.286.23 Replace a failed high pressure steam boiler sized for summer clinic loads and associated accessories. Determine the temporary construction required to separate the construction zones from other surrounding clinical and administrative spaces. [/span5][span2] CLIENT U.S. Air Force / U.S. Army Huntsville Center Corps of Engineers, 4820…
Read more