KGS improves EMR safety rating
KGS is proud to announce a significant improvement in our Experience Modification Rate, EMR, a key indicator of workplace safety.
KGS improves EMR safety rating Read More »
KGS is proud to announce a significant improvement in our Experience Modification Rate, EMR, a key indicator of workplace safety.
KGS improves EMR safety rating Read More »
USACE Savannah District, Environmental Compliance, Moody AFB, Seymour Johnson AFB, Shaw AFB and Joint Base Charleston KGS performed a fence-to-fence environmental compliance for these 4 sites under a TO for the Savannah District USACE. The SOW included providing comprehensive programmatic support of policies, guidance and regulations for USAF. KGS provided the following services: Hazardous Waste
Fence to Fence Environmental Compliance Read More »
NAVFAC Mid-Atlantic, Demolition of Building 20 and the Consolidation of Building 107, Naval Submarine Base New London, Groton, CT KGS renovated a major portion of Building 107 and converted the space from a former Public Works garage into a shop area. The area was completely gutted and all new plumbing, mechanical, HVAC, electrical, telecommunications, compressed air,
Demolition of Building 20 and Consolidation of Building 107 Read More »
USACE Philadelphia, Deep Excavation, Bulkhead Repair, Demolition, Construction Services Point Pleasant Canal, NJ This project involved the excavation and replacement of existing riprap toe protection, demolition of approximately 60 linear feet of existing bulkhead, deep excavation of soils/debris behind the existing bulkhead wall, installation of new steel sheet piling bulkhead in front of concrete abutment and underwater
Bulkhead Repair at Point Pleasant Canal Read More »
Demilitarization Operations for Material Potentially Presenting an Explosive Hazard at the Walker Lake Testing Range, Hawthorne Army Depot, NV Conducted demilitarization operations associated with MEC and material potentially presenting an explosive hazard (MPPEH) Demilitarized and disposed of material documented as safe (MDAS) and scrap metal accumulated during routine clearance sweeps of Walker Lake and a 2015
Demilitarization Of A Testing Range Read More »
NAVFAC, RAO at the Defense Fuel Supply Center (DFSC) Yorktown, Yorktown, VA Historical losses from the storage tanks at the DFSC resulted in an estimated 3M gallons of Navy Special Fuel Oil (NSFO) being released into the subsurface over 13 acres. The site included 77 monitoring wells, 30 temperature wells, 15 recovery wells, 28 recovery
O&M and LTM at DFSC Read More »
NAVFAC Mid-Atlantic, OM&M, Environmental Services, GM-38, Bethpage NY KGS performed the operation and major renovation/retrofits/optimization of a 1,100 gpm GWTP to remove chlorinated VOCs from the groundwater at the former Navy property GM-38. KGS executed preventative maintenance and troubleshooting activities in accordance to the OM&M Plan. To demonstrate compliance with the OM&M Manual and NYSDEC requirements,
OM&M Environmental Services Read More »
USACE Omaha District, MMRP TCRA, Kimama Training Site Area 3, Lincoln County, Idaho The MC RA included the excavation, characterization, and off-site disposal of soil exceeding established Project Action Limits (PALs) for lead at the western small arms range (SAR) berm within the Training Area 3 Munitions Response Site (MRS). Because of the site’s remoteness, hauling
MEC and Munitions Constituents Remedial Action Read More »