Solutions

Environmental Restoration

KGS has worked on over 300 HTRW investigation and remediation task orders.

KGS has in-house capabilities to perform full-service remediation. KGS has worked on over 300 HTRW investigation and remediation task orders valued at more than $115M for clients at BRAC, FUDS, IRP and Superfund sites. In the past 5 years, we have reduced our client’s lifecycle remediation costs by more than $20 million. KGS has continued our steady growth by offering focused services including:  emerging contaminant sampling including mitigation and/or investigation of PFAS, hazardous waste management for large and small quantity wastes, remedial construction at CERCLA, RCRA, and UST sites, civil construction, LTO/LTM of landfills and other regulated sites, Phase I/Phase II environmental site assessment, assessment and abatement of hazardous materials including asbestos and lead paint, chemical QA/QC and data validation, UXO and MMRP services and construction management/Title II services.

KGS has achieved more than 30 “Exceptional” and “Very Good” ACASS/CCASS ratings on projects for NAVFAC and USACE. Our success with clients has provided multiple opportunities for follow-on work, allowing us to develop a successful record of past performance

Projects

  • All
  • Investigation
  • LTM
  • O&M
  • PFAS/Emerging Contaminants
  • Remediation
bedrock core drill rig
Environmental Restoration
High Resolution Site Characterization (HRSC) Demonstration-Validation
High Resolution Site Characterization (HRSC) Demonstration-Validation, Air Force Plant 6, GA and Cape Canaveral Air Force Station, FL – USACE Omaha District KGS conducted High ...
Read More →
Environmental Restoration
In-Situ Enhanced Biodegradation Injections
In-Situ Enhanced Biodegradation Injections, Camp Bullis, Joint Base San Antonio (JBSA), San Antonio, TX – Air Force Civil Engineer Center (AFCEC) KGS/Trinity performed remedial injections ...
Read More →
monitoring well
Environmental Restoration
LTM and Management at JBCC
Long-Term Monitoring and Management at Joint Base Cape Cod, MA – USACE New England District KGS/Trinity performs Environmental Services at Joint Base Cape Cod (JBCC) ...
Read More →
PCB contaminated soil excavation
Environmental Restoration
FUDS Remedial Action
Formerly Used Defense Site (FUDS) Remedial Action and Project Closeout Activities, Lyndonville Former Air Force Station, East Haven, VT – USACE New England District KGS/Trinity ...
Read More →
groundwater long term monitoring
Environmental Restoration
OM&M & LTM at Former NWIRP Bethpage, NY
OM&M and LTM at the Former NWIRP Bethpage, NY – NAVFAC Mid-Atlantic KGS performs Operation, Maintenance, and Monitoring (OM&M) of the GM-38 Area Groundwater Treatment ...
Read More →
long term monitoring of groundwater
Environmental Restoration
OM&M & LTM at Former NAWC Warminster, PA
OM&M and LTM at the Former NAWC Warminster, PA – NAVFAC Mid-Atlantic KGS performed Operation, Maintenance, and Monitoring (OM&M) of the Groundwater Treatment Plant (GWTP); ...
Read More →