komangs2022stg

PCB contaminated soil excavation

FUDS Remedial Action

Formerly Used Defense Site (FUDS) Remedial Action and Project Closeout Activities, Lyndonville Former Air Force Station, East Haven, VT – USACE New England District KGS/Trinity was contracted to complete a Remedial Action at the Lyndonville Former Air Force Station (LFAFS) Formerly Used Defense Site (FUDS). The objectives were to excavate soil with polychlorinated biphenyls (PCB) […]

FUDS Remedial Action Read More »

monitoring well

LTM and Management at JBCC

Long-Term Monitoring and Management at Joint Base Cape Cod, MA – USACE New England District KGS/Trinity performs Environmental Services at Joint Base Cape Cod (JBCC) located in Bourne, Massachusetts for USACE New England District. JBCC encompasses 22,000 acres, 15,000 acres comprise the northern training area, the major training area for Army National Guard soldiers in

LTM and Management at JBCC Read More »

Skeet Range TCRA

Joint Base McGuire-Dix-Lakehurst TS875 Skeet Range TCRA – USACE Omaha District KGS performed a time critical removal action (TCRA) for delineation and removal of lead-impacted soils from a privately owned property located adjacent to JBMDL in Wrightstown, New Jersey.  This forested parcel borders a JBMDL munitions response site (MRS) and includes a wetlands area. The

Skeet Range TCRA Read More »

CERCLA Investigations at the Shepley’s Hill Landfill

CERCLA Investigations at the Shepley’s Hill Landfill, Former Fort Devens Army Installation, MA – USACE New England District KGS performed a wide range of investigations to assess the source of elevated arsenic concentrations in groundwater at and downgradient of the Shepley’s Hill Landfill (SHL) for USACE New England District. Work was conducted under CERCLA in

CERCLA Investigations at the Shepley’s Hill Landfill Read More »

In-Situ Enhanced Biodegradation Injections

In-Situ Enhanced Biodegradation Injections, Camp Bullis, Joint Base San Antonio (JBSA), San Antonio, TX – Air Force Civil Engineer Center (AFCEC) KGS/Trinity performed remedial injections of emulsified vegetable oil (EVO) substrate into five horizontal injection wells beneath a former landfill site to remediate chlorinated hydrocarbon impacts in groundwater.  Initial field efforts included jetting of the

In-Situ Enhanced Biodegradation Injections Read More »

bedrock core drill rig

High Resolution Site Characterization (HRSC) Demonstration-Validation

High Resolution Site Characterization (HRSC) Demonstration-Validation, Air Force Plant 6, GA and Cape Canaveral Air Force Station, FL – USACE Omaha District KGS conducted High Resolution Site Characterization (HRSC) at Air Force Plant 6 (AFP6), GA and Cape Canaveral Air Force Station (CCAFS), FL to refine the CSMs for each of the sites and better

High Resolution Site Characterization (HRSC) Demonstration-Validation Read More »

Fence to Fence Environmental Compliance

USACE Savannah District, Environmental Compliance, Moody AFB, Seymour Johnson AFB, Shaw AFB and Joint Base Charleston   KGS performed a fence-to-fence environmental compliance for these 4 sites under a TO for the Savannah District USACE. The SOW included providing comprehensive programmatic support of policies, guidance and regulations for USAF. KGS provided the following services: Hazardous Waste

Fence to Fence Environmental Compliance Read More »

Demolition of Building 20 and Consolidation of Building 107

NAVFAC Mid-Atlantic, Demolition of Building 20 and the Consolidation of Building 107, Naval Submarine Base New London, Groton, CT KGS renovated a major portion of Building 107 and converted the space from a former Public Works garage into a shop area. The area was completely gutted and all new plumbing, mechanical, HVAC, electrical, telecommunications, compressed air,

Demolition of Building 20 and Consolidation of Building 107 Read More »

Bulkhead Repair at Point Pleasant Canal

USACE Philadelphia,  Deep Excavation, Bulkhead Repair, Demolition, Construction Services Point Pleasant Canal, NJ This project involved the excavation and replacement of existing riprap toe protection, demolition of approximately 60 linear feet of existing bulkhead, deep excavation of soils/debris behind the existing bulkhead wall, installation of new steel sheet piling bulkhead in front of concrete abutment and underwater

Bulkhead Repair at Point Pleasant Canal Read More »